Ship the smallest thing that proves you're right.
An MVP isn't a worse product, it's a smaller one. We cut scope until only the core loop is left, then build that part properly - because a rough prototype tells you people dislike the execution, not whether they want the thing.
MVP Development
- Typical timeline
- 3 to 8 weeks
- Engagement
- Fixed scope, fixed price
- Who you work with
- Product designer, full-stack engineer
3-8
Weeks from first call to live
1
Core loop, built well, nothing else
100%
Production standards, not throwaway code
48h
Typical turnaround on a scope and quote
What usually brings people here
The scope keeps growing
The feature list started at six and is now at thirty. Every one feels essential, launch keeps moving, and nothing has been in front of a real user yet.
Six months in, nothing shipped
A freelancer, then another, then a rebuild. Burn is real, learning is zero, and the market has had half a year to move without you.
The demo undersells the idea
A no-code prototype held together with duct tape gets tested and people bounce. You learn the mock is bad, which is not the question you were asking.
What you get
A live product, the evidence to read it, and a codebase that's a starting point rather than a liability.
A scope you can defend
A workshop that ends with a written core loop and an explicit not-now list. Everything that survives ships; everything that doesn't is recorded, not forgotten.
A clickable prototype first
The real flows, designed and linked, in week one. Put it in front of five people before a line of production code exists.
Production-standard build
Typed, reviewed, tested where it matters, deployed on CI. Small by design, but not the kind of small you have to throw away in March.
Accounts and payments if the loop needs them
Sign-up, sessions and Stripe checkout wired properly, because 'would you pay' is answered with a card form, not a survey.
Instrumentation from day one
Analytics on the events that define activation, plus a funnel view, so week two produces a number rather than a feeling.
A roadmap out of the MVP
A written view of what to build next depending on what the data says, including the parts we deliberately deferred and what they'd cost.
How the build runs
Four weeks is the common case. The shape is the same whether it's three or eight.
Talk it through with us- 01
Scope workshop
Half a day. The user, the problem, the single loop that proves the idea, and the hypothesis we're testing. Ends with a fixed scope and a fixed price.
- 02
Design sprint
Week one. Flows and screens to production fidelity, assembled into a clickable prototype you can test on real people immediately.
- 03
Build
Weeks two to three or four. Staging updated continuously, a short check-in twice a week, no disappearing acts.
- 04
Launch
Domain, analytics, error tracking and a soft launch to your first cohort, with us watching the logs for the first few days.
- 05
Read the results
Two weeks after launch we go through the funnel together and decide, on evidence, what happens next.
What it's built on
Mainstream, well-supported tools your next developer will already know. We pick per project - this is the shortlist we choose from.
Application
- Next.js
- TypeScript
- Tailwind CSS
- shadcn/ui
Data and auth
- Supabase
- PostgreSQL
- Prisma
- Auth.js
Payments and mail
- Stripe
- Resend
- Twilio
- Cloudinary
Measurement
- PostHog
- GA4
- Sentry
- Vercel Analytics
Is this the right thing to buy?
We'd rather point you elsewhere on the first call than take on work that was never going to land well.
A good fit if
- You can name the one assumption the build has to test
- You're prepared to launch something smaller than the vision in your head
- You have a route to the first fifty users, even a manual one
- You'd rather have real data in six weeks than a full product in nine months
Probably not a fit if
- The scope genuinely can't be cut - that's a product build, and we do those too
- You need enterprise compliance in place before launch
- There's no plan for getting anyone to use it once it's live
The ones we get asked most
Anything not covered here, message us - you'll get a real answer from someone who'd be working on it.
Tell us what you're building.We'll tell you what it takes.
A short call is usually enough to size the work. You get a fixed scope, a timeline and a real number - normally inside 48 hours.

